ALTO, Marin County — October 31, 2026. Marin Water plans a significant upgrade to an older water main on the Mill Valley–Alto Tunnel corridor, intended to provide a more robust supply and improve fire-flow capacity.
What is being replaced?
The utility’s official capital-project page describes replacing 12-inch and 18-inch pipes originally installed in 1909 with a new 24-inch pipeline. The existing alignment passes through backyards; the new proposed route would use county open space and an undeveloped city parcel to reduce reliance on private residential yards.
When is work planned?
Marin Water lists planning through spring 2026, design through winter 2027, and construction from spring to fall 2027. These are forecasts that depend on design, permits, procurement and site conditions. The project is not confirmed as complete, and there is no basis to announce current road closures without updated notices.
How does this help firefighters?
Larger, more reliable water mains can improve flows and system redundancy where older lines are vulnerable to leaks or lack sufficient capacity. The improvement does not guarantee that every property will have the same water pressure or eliminate all wildfire hazards.
How to follow updates
Residents can review the project map and schedule on the official site and contact Marin Water Construction Management at 415-945-1560 about planned work or questions. Separately, emergencies and actual water service interruptions should be reported through the utility’s existing emergency channels.
Support Alto News
Choose how to support Alto News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Alto News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Alto News
- Alto Home Rebuild at 20 Shell Road Seeks Design Review and Removal of Two Protected Trees →
- 29 Shell Road Rebuild in Alto Still Under Review After October Design Board Meeting →
- Alto Homeowners May Qualify for Up to $7,500 in Sewer Lateral Repair Assistance →
- Alto Sanitary District Files Response to Marin Grand Jury Review of Local Special Districts →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.